Revamp of shipping pipe line (GPC)
Revamp of 6" shipping pipe line with length 12 km at Abu Sannan Fields (GPC)
- Plain concrete and reinforced concrete work.
- Assembly, Erection and welding for the pipe.
- Fabrication works for launcher and receiver.
- Inspection and hydro test.
- Sandblasting and painting.